Contractor management under the OSH Code: what principal employers check at the gate

What a principal employer must check before a contractor's first day and at the gate, in offices and plants, with templates to copy.

Written by the Contractor safety team, OrbLast reviewed 14 min read

Who this guide is for

Admin, facilities, EHS, security and compliance teams who sign off contractors at Indian offices, tech parks, data centres, campuses and plants: what to check before day one, at the gate and in the registers. We are GRC consultants and physical security practitioners, not your labour counsel: confirm thresholds and state rules with counsel. For plant gates, material passes and drivers, read our guide to visitor management for factories.

What is a contractor management system, and how is it different from visitor management?

A visitor management system handles a visit: who came, who approved, when they left. A contractor management system handles a relationship that can last years, with four checkpoints:

  1. Before award: is the firm licensed where the law needs it, and may this work go to contract labour at all?
  2. Before first entry: who is coming, are they inducted, and is identity verified where your policy calls for it?
  3. Every day at the gate: is this worker on a current list, with a valid pass, and in the headcount?
  4. At close: the pass ends with the work order and the records you must keep are kept.
Our view

Contractors and visitors share one gate and one guard, so run contractors through the visitor system as their own visitor type, and keep the contractor file (licence, work order, worker list) with admin or EHS.

What does the OSH Code 2020 ask of a principal employer?

The Occupational Safety, Health and Working Conditions Code, 2020 came into force on 21 November 2025 and replaced thirteen labour laws, including the Contract Labour (Regulation and Abolition) Act, 1970 (Trilegal). Contract labour sits in Part I of Chapter XI. In our words:

ProvisionWhat it saysWhat it means at the gate
s.2(1)(m), (n)Contract labour is a worker hired through a contractor, with or without the principal employer’s knowledge; a contractor includes a sub-contractorThe housekeeping firm’s sub-contracted helper is your contract labour too
s.2(1)(zz)Principal employer: in a factory, the owner or occupier; elsewhere, “any person responsible for the supervision and control of the establishment”Name one accountable person per site
s.45Part I applies where 50 or more contract labour are employed, or were employed on any day of the preceding twelve months, and to manpower supply contractors that employed 50 or more; not where work is only intermittent or casual (over 120 days a year is not intermittent)Count all contractors together, on your peak day
s.47A contractor to whom Part I applies needs a licence stating the number of workers and the security deposit; work-specific licences and single multi-state licences are possibleAsk for the licence and check its worker number
s.53Welfare facilities under sections 23 and 24 are provided by the principal employerYour toilets, drinking water and canteen serve contract workers
s.54Using contract labour from a contractor who needs a licence but has none is a contravention of the CodeThe gate turns away crews of an unlicensed contractor
s.55The contractor pays wages electronically and tells the principal employer; if it pays late or short, the principal employer pays and recoversYour attendance record is your evidence
s.57Contract labour in core activities is prohibited, with three exceptionsRecord why each contract is outside “core” or within an exception

Security, housekeeping, canteen, transport and similar support work is non-core unless the establishment was set up for it (section 2(1)(p)). Section 97 makes contravening any provision of the Code or its rules, or an order regulating the employment of contract labour, liable to a penalty of ₹50,000 to ₹1 lakh; a second conviction under the same provision can bring up to three months’ imprisonment, a fine of up to ₹2 lakh, or both. Failing to keep registers or file returns carries its own penalty of ₹50,000 to ₹1 lakh (section 96).

Our view

Wire section 54 into the gate: you cannot check wage slips daily, but you can refuse workers of a contractor whose licence you have not seen.

Does the OSH Code apply to offices and tech parks, or only plants?

It applies to offices. An “establishment” includes any place where “any industry, trade, business, manufacturing or occupation is carried on” with ten or more workers (section 2(1)(v)). Housekeeping, security, cafeteria, drivers and technicians from four or five vendors can pass 50 contract workers unnoticed. Three points catch offices out:

  • Who is the principal employer? In a multi-tenant tower the landlord or its facility manager usually engages common-area housekeeping and security; each tenant engages its own pantry staff and fit-out crews. See our guide to multi-tenant towers.
  • Fit-outs can be construction work. “Building or other construction work” includes alteration, repairs and maintenance (section 2(1)(h)), one of the activities where section 6(1)(h) makes the employer answer for everyone on the premises.
  • Central or state rules. The Central Rules govern where the Centre is the appropriate government: banks, insurance, telecom, air transport, major ports, railways, mines and central public sector enterprises (Lakshmikumaran & Sridharan; Anhad Law). Most private offices and plants follow state rules.
Our view

Count contract workers across every vendor at every site this week; the threshold turns on the total, not on any one contract.

The OSH (Central) Rules 2026 and state rules: licences, forms and returns

The OSH (Central) Rules, 2026 were notified as G.S.R. 345(E) on 8 May 2026 and came into force on publication, superseding fifteen older sets of central rules, including the Contract Labour (Regulation and Abolition) Central Rules, 1971. The contract labour rules are rules 85 to 101 of the Gazette text.

  • Licence: a contractor within one state applies in FORM-XXI on the Shram Suvidha portal (rule 87); a single licence for several states or all of India is decided within 45 days, or deemed granted, and is valid for five years (rule 88).
  • Threshold and deposit: the licence fee table says no licence is required up to 49 contract workers (rule 90(4)); before a licence issues the contractor lodges a bank guarantee of ₹1,000 per worker (rule 90(1)).
  • Work orders: the contractor reports each work order on the portal within 15 days, with the principal employer’s name, the premises, start date, worker numbers and duration (rule 94).
  • Welfare: where contract labour works on its premises, the principal employer provides toilets, washrooms, drinking water, bathing facilities if required, a changing room, a first aid box, a canteen and a crèche; the contractor provides everything else (rule 86(1)(iii) and (iv)).
  • Wages: if the contractor has not paid within seven days of the end of the wage period, the principal employer pays in full or the unpaid balance within 15 days, then recovers (rule 98(8)). The contractor files a half-yearly return in FORM-XVIII (rule 98(7)).
  • Grievances: the principal employer sets up a committee, with the contractor represented, that settles contract workers’ grievances on health, working conditions and wages within 30 days (rule 184).
  • Core activity disputes: an aggrieved party applies to the Central Government, and no adverse action is taken while the question is pending (rule 101). A Ministry order of 7 July 2026 gives a designated authority 60 days to report and the Ministry 30 days after that to decide (SCC Online).
  • Registers and returns: every employer keeps an employee register (FORM XIII), an attendance register-cum-muster roll (FORM XIV) and a wages register (FORM XV), electronically or otherwise, for five calendar years from the last entry (rule 72). The principal employer files Part III of the annual return in FORM-XVII by the last day of February, except for contracts to produce a given result (rule 98(9)). It asks for each contractor’s name, address and LIN, the work, the maximum contract workers, wage bill payments and any wages you paid directly.

The 2026 Rules drop the 1971 rules’ register of contractors (Form XII; Lakshmikumaran & Sridharan). Instead, the establishment’s registration in FORM-I (rule 3) lists each contractor’s name, contact details, work, maximum contract labour and dates, and rule 3(8) asks for changes to FORM-I to be updated on the portal within 30 days.

State rules. Trilegal reads the Ministry’s transition statement as keeping rules under the old Acts in force, where consistent with the Codes, until a state notifies its own. Rajasthan, Bihar and Andhra Pradesh notified final OSH rules between June and August 2026, while Maharashtra, Karnataka, Tamil Nadu and Delhi still had drafts (Lakshmikumaran & Sridharan state tracker). Check your state’s status before you print any form.

Our view

Keep a contractor register whether or not your state prescribes one. Your registration details, the annual return and an inspector all ask for its contents.

Contractor onboarding checklist: before the first day

Contractor safety induction: what to cover and what to record

The Code’s duty to give employees information, instruction, training and supervision sits in section 6(2)(c), framed particularly for factories, mines, dock work, construction and plantations; the contractor, also an “employer” (section 2(1)(u)), owes its own workers the same. ISO 45001:2018 asks organisations to coordinate with contractors on hazards running both ways and to others, and to apply OH&S criteria when selecting contractors (clause 8.1.4.2, under procurement; Ecesis). As of October 2026 the 2018 edition is current; the revision, at draft stage, is expected no earlier than April 2027 (SQS).

What a contractor induction should cover

  1. Site layout, exits, assembly points, alarm sounds, and who counts them in an evacuation.
  2. Hazards of their work areas, and areas they may not enter.
  3. PPE required, and where to get it.
  4. Permit-to-work: which jobs need one and who issues it.
  5. Reporting injuries, near misses and unsafe conditions.
  6. House rules: smoking, alcohol, phones, photography, escorts, confidentiality.
  7. Welfare facilities and first aid.

What the induction record holds

FieldExample
Worker and contractorRamesh Yadav, [Contractor name]
Induction version and languageVersion 3, Hindi
Areas coveredGround floor, basement plant room
Completed on, check passed14 October 2026, 8 of 10 correct
Delivered byOnline before arrival, gate briefing by [Supervisor name]
Next due13 October 2027, or on change of area
Our view

Refresh inductions yearly, on a change of area and after any incident. An induction that cannot be tied to a named worker and a date is not evidence.

Contractor gate pass format

One pass per contract worker; placeholders are in brackets. Material, vehicle and visitor passes are separate: see our gate pass format templates, and for the guard’s side of the check, our security guard SOP for visitor entry.

FieldWhat to enterWhy it matters
Pass number[Unique number]Traceable to one worker
Worker name and photo[Name]The guard matches face to pass
Contractor and licence number[Firm], [Licence no., or “not required” and why]Section 54 check
Work order and end date[PO or work order ref], [date]Pass ends with the work
Host at [Company name][Name, department]Who answers for the work
Contractor supervisor[Name, mobile]Who is called when something goes wrong
Areas allowed[Floors, zones]Escort rules and restricted areas
Valid from and to, shifts[Dates, times]No access outside the shift
Induction date and next due[Dates]No current induction, no entry
ID verified[Yes, by whom, date]Never the document number
Permit-to-work needed[Yes or no, permit number]Links to high-risk work
PPE and tools declared[List]Tools leave against the same list
Approved by[Name, date, time]Evidence of approval

The daily gate log adds time in, time out and gate; headcounts and wage disputes rest on those times.

At the gate: three scenarios

6:45 am, housekeeping shift change at a tech park office. A replacement arrives for a worker on leave, and Kavita Nair, the facility executive, sees the name is not on the list. The supervisor adds the worker, who completes the induction on a phone in the lobby; the host approves.

11:30 am, a fit-out crew on the ninth floor. A tenant’s interior contractor brings fourteen workers. The guard checks each against the list and induction record; the landlord’s hot-work permit names the four who will cut. The tenant engaged the crew, so it is usually their principal employer.

9:10 pm, an AMC technician at a data centre. The UPS vendor’s engineer arrives for a fault. The host is off shift, so the named backup approves; the engineer is escorted and stays in the headcount until he leaves.

Our view

Design for the replacement worker and the night call: each needs a current list and an approver who can be reached.

Contract worker data under the DPDP Act

Contractor lists, induction records and gate logs are digital personal data. Most duties under the DPDP Rules 2025 apply from 13 May 2027 (Rule 1(4)); some firms, including Cyril Amarchand Mangaldas, give 14 May 2027. A proposal to shorten the timeline was floated in January 2026 (Business Standard); as of 12 October 2026 no change had been notified (S.S. Rana & Co.).

  • Who decides what. PSA Legal (August 2026) treats the contractor as data fiduciary for payroll and deployment records, and the principal employer as one in its own right for site access, CCTV and safety training.
  • Notice. Give an itemised notice in English or any Eighth Schedule language the worker chooses (section 5(3)); we advise English, Hindi and the state’s main language at the gate.
  • Retention. Rule 8(3) sets a one-year minimum for personal data, traffic data and processing logs “for the purposes as specified in the Seventh Schedule”, which Cyril Amarchand Mangaldas and Lakshmikumaran & Sridharan read as binding every data fiduciary. Keep the visit record and its logs for one year, and photos and mobile numbers for days, as a decision your DPO and counsel sign off. Registers another law requires follow that law (section 8(7)).
Our view

Do not keep copies of contract workers’ ID documents in the security cabin; record that identity was verified and by whom. See our guide to the DPDP Act and your visitor register.

Common mistakes in contractor management

  • Counting one contract at a time. Four vendors with 15 workers each make 60 contract workers.
  • Stale lists. Replacements arrive and the gate list is months old.
  • Contractors outside the headcount. Employees are counted at the assembly point; the housekeeping crew is not. See our evacuation roll call guide.
  • Monthly passes with no end date, still valid after the work order ends.
  • ID copies in a drawer, or the register photographed for a WhatsApp group.

Where Orb fits

Orb, our visitor management system, runs the gate side of contractor management with nothing to install on site.

Before the first day

Contractors sign NDAs and complete inductions before they arrive, with ID verification for the visitor types your policy names.

The replacement worker at 6:45 am

The host approves in one tap in WhatsApp, Microsoft Teams or Slack; if they do not answer, a backup is asked, then the desk.

Passes that end with the work

The worker’s phone becomes the pass (gate, floor, host, valid until), its code changes every minute, and it works with your existing turnstiles and card readers.

Headcount and drills

The live register shows who is inside, contractors included, with an evacuation roll call and a drill report.

Data

Every look at a record is logged, and photos and mobile numbers are erased after seven days by default, with every retention clock configurable per detail.

Questions buyers ask

Do we need a contract labour licence if we have fewer than 50 contract workers?

The licence is the contractor’s, not yours, and two counts matter. Part I of the contract labour chapter applies to your establishment if 50 or more contract workers, across all contractors, are employed or were employed on any day of the past twelve months (section 45). Whether a contractor needs a licence turns on its own numbers: the Central Rules’ fee table says none is required up to 49 contract workers (rule 90(4)); check your state’s rules. Below both, the safety duties in section 6 still apply.

Is the principal employer liable if the contractor does not pay wages?

Yes, where Part I applies. If the contractor pays late or short, section 55 makes the principal employer pay and recover the amount. Where the contractor has not paid within seven days of the end of the wage period, rule 98(8) of the Central Rules gives the principal employer 15 days to pay.

Does the OSH Code apply to offices and IT companies?

Yes. An establishment is any place of business with ten or more workers (section 2(1)(v)), and contract housekeeping, security and cafeteria staff count towards the 50.

Is a safety induction mandatory for contract workers in India?

We found no induction format in the Code or the Central Rules. Section 6 safety and training duties, and ISO 45001 clause 8.1.4 where you work to that standard, make an induction record your clearest evidence. Check your state’s rules.

What registers does a principal employer need for contract labour?

Under the Central Rules: registers of employees, attendance and wages kept five calendar years, electronically or otherwise (rule 72); Part III of the FORM-XVII annual return on contractors by the last day of February (rule 98(9)); and contractor details in your FORM-I registration (rule 3). A contractor register (licence, work order, maximum workers, wage evidence) feeds all three.

Sources

  1. Occupational Safety, Health and Working Conditions Code, 2020 (text), DGFASLI, sections 2(1), 6, 33, 45, 47, 53 to 57, 96 and 97
  2. Section 2, OSH Code 2020 (definitions), Indian Kanoon
  3. Section 6, OSH Code 2020, Indian Kanoon
  4. Section 45, OSH Code 2020, Indian Kanoon
  5. Section 47, OSH Code 2020, Indian Kanoon
  6. Section 53, OSH Code 2020, Indian Kanoon
  7. Section 54, OSH Code 2020, Indian Kanoon
  8. Section 55, OSH Code 2020, Indian Kanoon
  9. Section 57, OSH Code 2020, Indian Kanoon
  10. Section 97, OSH Code 2020, Indian Kanoon
  11. Occupational Safety, Health and Working Conditions (Central) Rules, 2026, G.S.R. 345(E), Gazette of India, 8 May 2026 (StaffNews copy of the Gazette PDF), rules 1, 3, 72, 85 to 101 and 184, FORM-I and FORM-XVII
  12. OSH (Central) Rules, 2026, Lakshmikumaran & Sridharan, 9 June 2026
  13. Statutory registers and form formats, Lakshmikumaran & Sridharan
  14. State-wise labour code rules, Lakshmikumaran & Sridharan, read 18 October 2026
  15. Labour Codes go live, Trilegal, 22 November 2025
  16. Notified OSH (Central) Rules 2026: what employers need to know, Anhad Law on Mondaq, 8 May 2026
  17. Centre notifies procedure for determining core activities under OSHWC Rules, 2026, SCC Online, 15 July 2026
  18. Private Security Agency Licensing Portal, Ministry of Home Affairs
  19. ISO 45001 operational planning and control, Ecesis
  20. Revision of ISO 45001:2027, SQS
  21. Draft version of ISO 45001 released, DNV, 3 July 2026
  22. Two employers, one worker: DPDPA’s silence on contract labour, PSA Legal, 20 August 2026
  23. Digital Personal Data Protection Act, 2023, Ministry of Electronics and IT
  24. DPDP Rules 2025, Rule 1 (commencement), dpdpa.com reproduction of the Gazette text
  25. DPDP Rules 2025, Rule 8 (retention and erasure), dpdpa.com reproduction of the Gazette text
  26. FAQs on the Digital Personal Data Protection Act and Rules, Cyril Amarchand Mangaldas, law as on 7 December 2025
  27. Digital Personal Data Protection Rules, 2025: incremental tweaks and the way ahead, Lakshmikumaran & Sridharan, updated 16 July 2026
  28. MeitY may cut compliance timeline for key DPDP rules to 12 months, Business Standard, 22 January 2026
  29. DPDP Removal of Difficulties Order 2026: what has been changed, S.S. Rana & Co., 12 October 2026

This guide reflects the law and published guidance as of 18 October 2026. It is general information, not legal advice: confirm contract labour thresholds, state rules and data decisions with your counsel.

Read next

See every step of this guide in your own lobby.

Orb is the visitor management system we built for these gaps. We will walk your facilities, security and DPO teams through it on your own site.