ISO 27001 and your lobby: what Annex A 7.2 physical entry means for visitor management

How auditors read control 7.2 at your front desk, what your visitor log must prove, and the evidence pack that closes the finding.

Written by the Compliance team, OrbLast reviewed 13 min read

Who this guide is for

CISOs and ISMS owners, the facilities, admin and security heads who run the front desk and gate, and compliance teams preparing for a Stage 2 or surveillance audit at an Indian office, tech park, factory, campus or multi-tenant building, whether visitors are recorded in a logbook, a spreadsheet or a visitor management system.

What changed in ISO 27001:2022, and is your certificate on it?

ISO published the third edition of ISO/IEC 27001 in October 2022, with a climate action amendment in 2024 (ISO). Annex A now holds 93 controls in four themes, down from 114 in 14 clauses: 11 are new, 24 merged from older ones and 58 updated (DQS). The themes are organisational (37 controls), people (8), physical (14) and technological (34) (TCSA).

The transition is over. Under IAF MD 26:2023, issued by the International Accreditation Forum, certification bodies had to start all initial and recertification audits on the 2022 version by 30 April 2024, and every certification based on ISO/IEC 27001:2013 had to expire or be withdrawn at the end of the transition period on 31 October 2025 (IAF MD 26, INAB, SGS). The IAF ceased operations on 1 January 2026, when its work passed to the Global Accreditation Cooperation Incorporated, known as Global ACI (IAF). As of October 2026, any valid accredited certificate should name ISO/IEC 27001:2022.

For the lobby, the change that matters is the renumbering (NQA mapping, which uses the 2017 European edition with the same numbering as 2013):

ISO 27001:2013 controlISO 27001:2022 control
A.11.1.2 Physical entry controls7.2 Physical entry
A.11.1.6 Delivery and loading areas7.2 Physical entry
A.11.1.1 Physical security perimeter7.1 Physical security perimeters
A.11.1.3 Securing offices, rooms and facilities7.3 Securing offices, rooms and facilities
None7.4 Physical security monitoring (new)
Our view

If your visitor policy, Statement of Applicability or vendor contract still cites A.11.1.2, update it now. Outdated references tell an auditor the ISMS has not been maintained.

What Annex A 7.2 physical entry actually asks

The control is one sentence. In our words: protect secure areas with appropriate entry controls and access points, so only authorised people get in. It prescribes no turnstile, card reader or type of register. Your risk assessment decides what “appropriate” means for each area, and you show that it works. Three things follow:

  • It applies to points of entry, not just server rooms. Consultants describe 7.1 as the perimeter and 7.2 as the controlled points where people cross it: badge systems, visitor management and delivery areas (TCSA). Reception is usually the first.
  • The loading bay is now in the same control. With the 2013 delivery and loading areas control merged into 7.2, the goods gate, courier counter and vendors’ back entrance are tested alongside the front desk.
  • Your boundary may not be the building’s. In tech parks and multi-tenant towers the landlord usually runs the lobby, turnstiles and lifts. Consultants advise treating those as an outer ring you verify but do not own, with your enforceable boundary at your own suite door (TCSA). In co-working, the operator’s reception and member cards are controls you inherit and document.

Smaller organisations can describe how entry is controlled in the Statement of Applicability; mid-sized and larger ones should write a physical security policy (Advisera).

Our view

Auditors rarely fault a modest control; they fault one that is written down but not running at the gate. “The building handles visitors” is not an answer unless you can produce the building’s record of who was let up to your floor, and who approved it.

What ISO 27002 7.2 guidance says about visitors

ISO/IEC 27002:2022 is the guidance standard behind Annex A. It cannot be certified against (ISO), but auditors use it to judge whether your control is reasonable. Paraphrased, its 7.2 guidance covers three groups.

Visitors

  • Identity: authenticate who the visitor is by an appropriate means.
  • Times: record the date and time of entry and departure.
  • Purpose: give access only for a specific, authorised purpose, and tell visitors the security rules of the area and the emergency procedures.
  • Supervision: supervise all visitors unless an explicit exception has been approved.

General entry controls

  • Visible identification: everyone wears visible identification, staff tell security when they see someone unescorted or without it, and badges that tell employees, suppliers and visitors apart are worth considering. Consultants add that a visitor badge should show when it expires (High Table, TCSA).
  • Suppliers: supplier staff get access to secure areas only when needed, and that access is authorised and monitored.
  • Shared buildings: a building that holds the assets of several organisations needs particular attention to physical access, which describes most Indian tech parks and multi-tenant towers.
  • Records: keep a logbook or electronic audit trail of access, and protect it.
  • Review: review and update access rights regularly, and take them away when they are no longer needed.

Delivery and loading areas

  • Restriction: only identified, authorised people reach delivery areas from outside.
  • Separation: keep goods movement apart from people movement; the internal door stays locked while the external door is open.
  • Inspection and registration: hold incoming material in the delivery area until it is inspected and registered under your asset procedures, and keep delivery staff inside the delivery zone (TCSA, UpGuard).

Two mistakes recur in published advice. One says ISO 27001 requires ID verification for every visitor; the guidance asks for identity to be authenticated by appropriate means, which is your risk decision. The other quotes a fixed retention period “under ISO 27001”; neither standard sets one.

Our view

Treat identity, times, purpose and supervision as the minimum fields of every visit record. Findings usually start with a sampled visit missing one.

What a Stage 2 or surveillance auditor asks for at the lobby

Stage 1 reviews documentation and readiness; Stage 2 tests implementation and normally covers physical entry. Surveillance audits in the next two years cover a rotating sample of Annex A controls, so 7.2 may not be tested every year, and recertification follows in the third (TCSA). When 7.2 is tested, auditors use document review, interviews with reception and security staff, and observation at the entry points (TCSA). Expect requests like these:

  1. The visitor or physical security policy, approved, versioned and recently reviewed.
  2. All visitor records for a date the auditor picks, with a few traced end to end: approval, pass, escort, exit time.
  3. Approval evidence: a record of who approved and when, not “the host said yes on the phone”.
  4. Badge or pass control: how badges are issued and returned, and what happens to a lost one.
  5. Escort rules, tested by asking a guard what happens when a visitor walks off alone.
  6. Contractor inductions and NDAs for contractors on site that day.
  7. Who accessed visitor records, and evidence that access is restricted and reviewed.
  8. Retention: your stated period for each detail, how it fits the DPDP Rules, and proof that older records are gone.

Auditors may also test whether a recent leaver’s badge still works and check how the delivery area is separated from internal corridors (TCSA).

Our view

Rehearse the date sample: pick a busy day from last month and produce every record, approval and exit time in ten minutes. If you cannot, the auditor will find the same gap.

Common nonconformities at Indian sites

These are the gaps we see most often at Indian offices, campuses and plants.

  • Unapproved walk-ins. The guard lets a vendor in because “sir is expecting him”, and the approval is only a phone call or a forwarded WhatsApp message.
  • Shared badges. Numbered visitor cards, no record of which went to whom, and nobody counting them at day end.
  • Visitor lists not reconciled. The building lobby keeps one record, the tenant a spreadsheet, and they never match.
  • No exit times. Visitors leave by the side gate and the “out time” column stays blank.
  • Tailgating at turnstiles. A visitor follows a staff member through on one swipe in the morning rush.
  • Contractors without induction records. Housekeeping, AMC technicians and project labour on monthly passes, with no signed induction or NDA.
  • Open registers. Each visitor can read the names and mobile numbers above their own, also a 5.34 problem.
  • Policy and practice disagree. The policy says all visitors are escorted; the guard says only on the server floor. UpGuard names this gap as a common finding.
Our view

Each of these is usually a minor nonconformity, but several on one site suggest the control is not operating, which can become a major one. Fix exit times and approvals first, because auditors trace them.

What your ISO 27001 visitor log should record

For each visit, a log that stands up in an audit records: visitor name and organisation; host, approver and time of approval; purpose and areas allowed; how identity was checked, for the visitor types that need it; badge or pass and its validity; date and time in and out; escort or approved exception; and, for contractors, induction and NDA completed. Keep nothing more: every extra field is personal data to protect and erase under the DPDP Act.

Our view

A good visitor log answers “who was in the building at 3 pm on the 14th, who let them in, and have they left?” in minutes.

Writing an ISO 27001 visitor policy

A visitor policy for 7.2 can be short. It covers:

  • Scope and zones: sites, gates, visitor types, and who may enter which areas.
  • Approval: who approves, the backup when the host is away, and walk-ins.
  • Identity, badges and escort: when identity is checked, how visitor badges differ, and escort rules.
  • Contractors and deliveries: inductions, NDAs and review for long passes; where couriers and goods stop.
  • Records: what is recorded, who sees it, how access is logged and how long it is kept.
  • Incidents: what a guard does on refusal, tailgating or an unescorted visitor.
Our view

Have the heads of security and facilities sign the policy alongside the CISO. If the people who run the gate did not agree to it, it will not be what happens there.

The 7.2 evidence pack

Evidence itemControlWhat good looks like
Visitor and physical security policy7.2, 7.1Approved, versioned, reviewed in the last 12 months, matches practice
Visit records for any date7.2Every visit has identity, host approval, purpose, time in and time out
Host approval trail7.2, 5.18Named approver and timestamp for each visit, not verbal
Badge or pass register7.2Each pass traceable to one visitor, expired or returned the same day
Escort rules and exceptions7.2, 7.6Written rule, approved exceptions recorded
Contractor inductions and NDAs7.6, 5.18Signed before first entry, linked to the contractor’s pass
Delivery area procedure7.2Goods and people separated, inspection before goods move inside
Access log of the visitor records8.15, 5.15Access limited to named roles and reviewed; in an electronic system, views and exports logged
Retention and erasure records5.34, 8.10Defined period per detail, proof of erasure on schedule
Our view

Build this pack once, refresh it monthly and hand it over at the opening meeting. It shortens the lobby part of the audit.

ISO 27001 lobby checklist before your next audit

Where Orb fits

Orb, our visitor management system, supports your ISO 27001 audit for Annex A 7.2 by producing the visit records and access logs above with each visit.

A Stage 2 or surveillance audit is coming

One record per visit, with host approval and pass validity, plus a live register of who is inside right now.

Hosts are hard to reach

The host approves in one tap in WhatsApp, Microsoft Teams or Slack; if they do not answer, a backup is asked, then the desk.

Contractors and factories

Contractors sign NDAs and inductions before they arrive, with ID verification for the visitor types your policy says need it.

Badges and turnstiles

The visitor’s phone becomes the pass, with a code that changes every minute, and it works with your existing turnstiles, card readers and face recognition gates.

Logging and privacy evidence

Every look at a visitor record is logged, and each detail is erased on the schedule you set (photos and mobile numbers after seven days by default), with a signed record of each erasure.

Questions buyers ask

Does ISO 27001 require a visitor management system?

No. ISO/IEC 27001:2022 requires entry controls appropriate to your risk, not a particular tool. A manual register can meet 7.2 if it records identity, approval, times and escort and is kept secure and reviewed; the hard part is keeping that up on every shift and gate.

How long should we keep visitor logs for ISO 27001?

Neither ISO 27001 nor ISO 27002 sets a period, so set one in your policy in line with the DPDP Rules 2025. From 13 May 2027, Rule 8(3) asks for personal data, associated traffic data and processing logs to be kept for at least one year “for the purposes as specified in the Seventh Schedule” (State purposes), which Cyril Amarchand Mangaldas and Lakshmikumaran & Sridharan read as applying to every data fiduciary. We advise keeping the visit record and its logs for one year and photos and mobile numbers for days, as a written decision your DPO and counsel sign off because the rule speaks of personal data generally, and keeping proof that older records were erased.

Is A.11.1.2 still valid for ISO 27001 audits?

No. A.11.1.2 belongs to the 2013 version, and all 2013 certifications had to expire or be withdrawn at the end of the transition period on 31 October 2025 under IAF MD 26. Its content now sits in Annex A 7.2, together with the old delivery and loading areas control.

Can a visitor management system be ISO 27001 compliant?

Certification applies to an organisation’s information security management system within a defined scope, not to a product. A vendor may hold a certificate for its own scope; ask for it and the scope statement, and remember your own 7.2 control still has to work at your gate.

Do contractors count as visitors under Annex A 7.2?

Short contractor visits are treated like any visit. Contractors on long passes go through your access rights process (5.18), with an induction and NDA before first entry and a review that removes access when the work ends.

Sources

  1. ISO/IEC 27001:2022, Information security management systems: Requirements, ISO, October 2022 (Amd 1:2024)
  2. ISO/IEC 27002:2022, Information security controls, ISO, February 2022
  3. IAF MD 26:2023, Transition Requirements for ISO/IEC 27001:2022, Issue 2, International Accreditation Forum (its work passed to Global ACI on 1 January 2026), 15 February 2023 (copy hosted by the Singapore Accreditation Council)
  4. Global Accreditation Cooperation Incorporated launch, IAF, 1 January 2026
  5. NF38 Transition requirements for ISO/IEC 27001:2022, Irish National Accreditation Board, March 2023
  6. ISO/IEC 27001:2022 transition support, SGS
  7. Transition requirements for ISO 27001:2022, DQS
  8. ISO 27002:2017 to ISO 27002:2022 mapping tool, NQA
  9. ISO 27001 Annex A control 7.2 Physical entry, Advisera
  10. ISO 27001 A.7.2 Physical entry, TCSA
  11. ISO 27001 A.7.1 Physical security perimeters, TCSA
  12. ISO 27001 Annex A controls, TCSA
  13. ISO 27001 certificate validity, TCSA
  14. ISO 27001 Annex A 7.2 Physical entry, High Table
  15. ISO 27001 Annex A 7.2 audit checklist, High Table
  16. ISO 27001 7.2: Physical entry controls explained, UpGuard
  17. DPDP Rules, 2025 notified, Press Information Bureau, 14 November 2025
  18. Digital Personal Data Protection Rules, 2025, G.S.R. 846(E), Gazette of India, 13 November 2025
  19. MeitY notifies Digital Personal Data Protection Rules, 2025, SCC Online, 14 November 2025
  20. FAQs: The Digital Personal Data Protection Act, 2023, Cyril Amarchand Mangaldas, law as on 7 December 2025
  21. Digital Personal Data Protection Rules, 2025: incremental tweaks and the way ahead, Lakshmikumaran & Sridharan, updated 16 July 2026
  22. MeitY may cut compliance timeline for key DPDP rules to 12 months, Business Standard, 22 January 2026
  23. DPDP (Removal of Difficulties) Order, 2026: what has been changed for children’s data and SDF audits, S.S. Rana & Co., 12 October 2026

This guide reflects the standards and published guidance as of 13 October 2026. It is general information, not legal or certification advice: confirm your approach with your certification body or auditor.

Read next

See every step of this guide in your own lobby.

Orb is the visitor management system we built for these gaps. We will walk your facilities, security and DPO teams through it on your own site.